Creating economic, social and environmental value from waste, salt and clay resources  
 

  Safety Case  
 
  You are here: HOME > PROJECTS > SANDY RIDGE KAOLIN MINE PROJECT > SAFETY CASE  
 
 
 
 
Safety Case
Clear
Clear
Tellus' Sandy Ridge facility safety case is both a written presentation and an operational requirement dealing with the technical, management and operational information regarding the hazards and risks of our operations and how they are managed and mitigated. It considers the safety of:
  • the transport of wastes to the facility
  • the construction and operation of the facility
  • the safety of the facility after it has been closed
Our safety case, draws on best practice from around the world and from geological environments similar to Sandy Ridge that are internationally recognised as suitable to host a geological repository. Tellus will only accept wastes at the facility if they meet strict waste acceptance criteria and will store compatible “like with like” wastes to ensure operational safety and create opportunities for the future recovery and reuse of valuable materials. Our operational and long term safety case is underpinned by utilizing a combination of engineered and natural geological barriers, known as a multi-barrier system, which provides long term containment and isolation of the wastes placed in the facility.


Management Plans

Management plans will be uploaded pending development consent of the proposed Sandy Ridge Facility from both the WA Government and the Commonwealth Government.
 
 
 
 
 
Clear
Clear
  RETURN TO TOP Return to Top
 
 
 
     
 
 
  © TELLUS HOLDINGS LTD   ABN 97 138 119 829   PRIVACY POLICY   TERMS & CONDITIONS   WARNINGS   WebWorks with LYNC CREATIVE™